Bleed the air and humidity with the refrigerant circuit. Take away the caps in the 2-way and three-way valves and with the service port and link a vacuum pump hose on the provider port.Suggestion: Situate the concrete pad so that it’s substantial enough to maintain the unit away from any water which could puddle on the bottom because of rain or s